未标题-1.jpg

Best Sales Metal Light Weight Prefabricated Structural Steel Office Building / Hangar / Workshop /Warehouse

2025-04-17

Product Introduction

Steel structure building is built over three members connected to each other by bolts and screws:
Primary members (columns, beams)
Steel columns will be H section steel, square tube steel according to different type of buildings. Steel beams are usually H section steel.
Products Description
1746785119779407042615316480.jpg
Steel structure office building
Item
Specification
Steel column
Q235,355B welded square tube column/Box column
Steel beam
Q235,355B welded H section steel/hot-rolled H section steel
Steel purlin
C/Z section purlin or square tube column
Downpipe
UPVC
Gutter
Stainless steel gutter/UPVC gutter
Roof material
Corrugated steel sheet/sandwich panel
Wall material
Sandwich panel and glass curtain wall
Door
Aluminium door
Window
Aluminium window
1746785119779407042632101890.png
What is prefabricated steel structure building?
Steel structure building is built over three members connected to each other by bolts and screws: Primary members (columns, beams) Steel columns will be H section steel, square tube steel according to different type of buildings. Steel beams are usually H section steel. Secondary members (C or Z purlins, bracing...) Roof and wall sheeting or sandwich panel (EPS, fiberglass wool, PU sandwich panel) Other building components (Rolling doors, aluminium windows, etc.) The entire primary members and secondary members are designed and fully fabricated including cut-to-length, punching, drilling, welding and performing in the factory before shipping to the site for erection. At the site, all components are assembled and jointed via nut & bolt connections; thereby reducing the costs and assembly times. These buildings can be provided with different structural and non-structural additions such as ventilators, doors & windows, trusses, mezzanine floors, canopies, crane, insulation…, based on the customer's requirements.
Project Cases
1746785119779407042632097792.jpg
Compared with traditional concrete buildings, steel structure buildings use steel plates or section steel to replace reinforced concrete, which is stronger and more resistant to earthquakes. And because the component can be factory made, site installation, thus greatly reducing the construction period. Due to the reusable steel, it can be greatly reduced the construction waste, and more green environmental protection, so it is widely used in industrial buildings and civil buildings over the world.
If you want a building that has cost saving, fast erection, good quality control, high durability, steel structure buildings will be the best choice. As the latest trend in building construction, steel structure buildings increasingly confirmed their outstanding advantages in agricultural, industrial and commercial projects such as workshop, warehouse, workshop, factory, storage, showroom, office building, supermarket, school, stadium, logistics center, etc…
1746785119779407042636300290.jpg
Advantages of steel structure buildings
1. Cost Savings Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process. 2. Quality Control Designed and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory. 3. Quick Erection All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install. 4. Flexibility Steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs. 5. Energy Efficiency Nowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recycle.


Design Drawings

ea6e5af410c647b3d807d3734c8d637.png

1746785119779407042632097794.jpg

Installation of steel structure building

1.Foundation construction (pre-embedded anchor bolts), detail need to according to the foundation construction drawing.

2.Column installation One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location. 3.Beam installation After completing the installation of adjacent two steel column, then main beam begin to install. 4.Installing roof & wall purlin The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure. 5.Fixing wall and roof sheet To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet. 6.Fixing the cover To install the cover on the corner, eave, window and door opening. 7.Install windows and doors.
Company Profile
1746785119779407042632101888.png


Product packaging

1746785119779407042636300288.png


相关推荐

Online Message

Submit